Who Takes Over the Tile Load at Birgunj?
Nepal is landlocked and Kathmandu sits inland, so a quote that ends at Birgunj may leave the road leg to your named Kathmandu warehouse to be arranged separately. Before accepting such a quote, confirm the crossing, the transport mode, the exact handover point and who books the onward vehicle. Raxaul–Birgunj is a commonly discussed crossing, but it should be confirmed for your shipment rather than assumed.
If the load changes vehicles at handover, settle these points in writing before dispatch:
- Will pallets be transferred whole, or will cartons be handled loose?
- Who inspects the pallets at handover?
- How is any damage recorded, and on which document?
Ask the transporter to confirm the permitted load for each booked vehicle on the planned route. Pallet dimensions, strapping and edge protection belong in the same discussion, while wood-packaging requirements are a shipment-specific check with your clearing agent. If dispatch falls during the monsoon, ask your forwarder to confirm the planned onward route and explain how a road disruption would affect the delivery estimate.

Price Both Quotes to the Same Warehouse Gate
A lower rate only means something once both quotes reach the same named place. Bring each one to your Kathmandu warehouse by adding the legs and charges it leaves out. The table shows two illustrative quote structures.
| Quoted endpoint |
Onward carriage |
Import clearance and taxes |
Unloading |
Excluded charges to confirm |
| Illustrative: handover at a named point in Birgunj |
Buyer arranges the road leg to the named Kathmandu warehouse |
Buyer arranges import clearance and pays applicable import duties and taxes |
Buyer arranges at the warehouse |
Border handling, transfer, onward freight, clearance fees, duties and taxes, unloading labour |
| Illustrative: DAP named Kathmandu warehouse (Incoterms® 2020) |
Seller delivers to the named destination, ready for unloading |
Buyer remains responsible for import clearance and applicable import duties and taxes |
Buyer arranges unloading |
Clearance fees, applicable duties and taxes, unloading, any waiting or storage charges |
Ask both suppliers to confirm the comparison address, clearance responsibilities, unloading arrangements and excluded charges in writing.
Who is responsible for import clearance is a separate question from where and in what sequence customs formalities take place. Confirm the customs location and the order of steps for your shipment with your Nepal clearing agent or forwarder, rather than assuming clearance at Birgunj, clearance in Kathmandu or an in-bond movement. For background, the Department of Customs publishes a Nepali-language listing of annual integrated tariff schedules. Your clearing agent should confirm the exact tariff line and applicable charges.
Both quotes also need the same unit basis. Multiply an NPR per sq ft rate by about 10.76 to get NPR per square metre. Divide a carton price by the supplier's declared square metres per carton to get the price per square metre. Then compare on the same currency and delivery basis, alongside pallet count and quote validity.

Choose Wall Tile Sizes Around Niches and Fixtures
The same wall tile can produce clean joints in one bathroom and awkward slivers in the next, so cut planning belongs before carton ordering. Take an illustrative multi-bathroom order with two layouts: one with a recessed niche beside the shower, the other with a wall-hung basin and concealed cistern. A 300×450 mm tile that centres neatly on the niche in the first layout may leave a narrow strip beside the basin in the second.
Mark the cuts on each elevation drawing using the supplier's confirmed actual tile dimensions and the planned joint width, rather than nominal sizes. Where wall and floor tiles come from the same series, the drawing should also show how the wall joints meet the floor grid. Wall finishes can then be judged on the physical sample against that checked layout.

Use the drain position and floor falls to guide the choice of shower tile format. Where a central point drain creates falls from several directions, compare 300×300 mm and 600×600 mm on the actual project drawing and see which follows the falls with fewer awkward cuts. An edge linear drain can allow a single-plane fall, depending on the layout, which may open up other options.
Use the resulting cut plans to estimate wall and shower quantities, then add the installer's recommended allowance for unusable offcuts, breakage and same-batch spares.
Approve Wall, Main Floor and Shower Tiles Separately
Each surface carries a different risk, so a single approval for the whole bathroom can let the wrong evidence through.
| Surface |
What to check |
Evidence to request |
Approval decision |
| Bathroom walls |
Layout against wall heights, niches and fixtures |
Supplier dimensional data and an approved physical sample, with additional documents only where the project requires them |
Approve size, finish and the checked layout |
| Main bathroom floor |
Use area named in the project specification |
Evidence for the exact tile and finish against the specified test method and acceptance criteria for that use |
Approve only if the evidence meets those criteria |
| Shower floor |
Exact tile and finish, plus separate checks for drain position and falls |
Applicable wet-barefoot evidence for the exact tile and finish |
Approve only once the result meets the project's acceptance criteria and the format suits the falls |
A matt and a polished version of one design can perform differently underfoot, so evidence for one does not cover the other. Carry each approved product reference into the purchase order and the bathroom schedules, so hotels, shared washrooms and multi-unit projects receive the surface that was actually approved.
Final Takeaway
For a Kathmandu bathroom order, the quote structure matters as much as the tile, because an inland destination can leave responsibilities and charges split between Birgunj and your warehouse. Before signing the purchase order, record the named delivery point and the charges you will still pay, with your clearing agent's confirmation of the applicable import charges. For the shower floor, record the approved tile and finish after checking that the slip evidence meets the project's criteria and that the format suits the drain layout. Share your specifications, quantity and destination to discuss sourcing options.
Disclaimer
When planning bathroom tile sourcing for KATHMANDU, final costs and responsibilities can vary significantly depending on the supplier's terms.
Any incomplete quote must be adjusted to account for onward road freight, border handling, import clearance, and unloading before comparing final delivered prices.
Technical performance and formats should be carefully matched to your layout, particularly regarding shower drains, wet-barefoot slip resistance, and potential road disruptions during the monsoon season.
Duty, tax, certification and customs requirements can change, so confirm the current position with your customs broker or the relevant authority before booking a shipment.
All specifications must be verified with suppliers or professionals before final decisions.
Images, designs, colours and finishes are for reference and may differ in actual supply due to lighting conditions, screen variations and batch differences, so consider reviewing physical samples before a bulk order.
Final procurement should always be based on verified physical samples, confirmed layout requirements, and a comprehensive quote to your exact warehouse door.